cancel
Showing results for 
Search instead for 
Did you mean: 

Change of standard address results in R11 245

Former Member
0 Kudos

Hello,

I have a problem, and this is the scenario:

1. There is an IS-U ECC System connected with CRM

2. CRM is a time dependent system from beginning.

3. IS-U ECC system was time independent system during initial/delta load to CRM

4. IS-U ECC system was set up as time dependent for addresses (running report BP_TD_SWITCH), after the initial/delta load of partners to CRM.

5. I am maintaining 2 standard addresses in R/3 (with validity periods assigned).

6. Change of standard address in IS-U ECC makes error in CRM - R11 245 "Error for validity periods of address usages".

Can someone help me out? Why is this happening?

The system is on ABA 700.

Accepted Solutions (1)

Accepted Solutions (1)

Kanagaraja_L
Active Contributor
0 Kudos

Check the following Forum you can get some idea

Kanagaraja L

Answers (0)