on 01-19-2008 4:38 AM
hi all,
my client scenario:
he will procure Raw materials from vendor, after receiving the goods he will send those to third party(LAB) to inspect .
now my query is:
whenever he is sending to lab insp.lot should generate
after inspection he should able give batch no with characterstics.how to map this.
very urgent
prasad
pl come back
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
pl come back
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Why isn't this just a standard GR that creates an 01 inspection lot?
What I don't know is are you sending the entire quantity out to the lab for testing or just a sample?
If your just sending a sample, use physical samples to manage the sample qty going off-site. (I'm assuming your not getting this qty back, if its a chemical and the amount is negliable then don't worry about this).
If your sending out 100% of the material, then we may need to suggest a different approach.
Craig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Prasad,
MAke it clear, who is procuring the raw material and sending it to vendor?
Is it your customer/client?
If so,
Activate 01 inspection type. MAke the GR to bloxked stock (103 mov type), system will create a batch and Send it to inspoection authority, once you receive the material make transfer posting from blocked (mov type 101) stock to UN stock, in which system will create a inspection lot for which you can do the inspection results what you got from inspction authority
for this make sure that in OMJJ, for mov type 103, insp activation is deactivated.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Prasad..,
for issue 1:
1. Extend the material for Quality Management and give the inspection type "01". Goods Receipts inspection.
2. Create inspection plan in (qp01) and assign the characteristics which are measured for the material in lab.
3. Characteristics are created n QS21.
4. as soon as you receive the goods they will be posted to inspection qty.
5. you can post the inspection results in qe01 and take the usage decision in qa11.
6. then material will be posted to unrestricted stock.
for issue 2:
activate batch management for the material
and to the custimization for the batch management give the interial number range the material will be posted to batch with number.
if have issue come back.
regards.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
97 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.