on 01-16-2008 12:53 PM
Hi,
I have a problem with my QAS ECC system: about three hundred tables are missing from the database and I need to create every single one using SE14.
However, I was wondering if is there any way to schedule the creation of all of them at the same time, or must I do it one-by-one on SE14 (even by including it on a "mass processing")?
Thanks,
Antonio
Hello Antonio,
Antonio in case data in the tables is not of immediate concern and only the table structures are then simply transport the tables.
Regards.
Ruchit.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Why don't you refresh from you production system?
Regards
Juan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I can't because the QAS system is being used.
The missing tables are from areas not from the current installed projects, so they are not relevant. However, I need them activated because I'm creating a new client on the QAS system and the local copy with the SAP_CUSV profile ends with errors due to the database inconsistency.
User | Count |
---|---|
85 | |
23 | |
11 | |
9 | |
8 | |
5 | |
5 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.