cancel
Showing results for 
Search instead for 
Did you mean: 

QM

Former Member
0 Kudos

can we automatically trigger the creation of inspection lot for material coming from subcontractor. If yes please explain the required setting to do.

With Regards

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Yes,

Just activate insp 01 in material master and create inspection plan with usage 5(GR). assogn the trequired charecteristics.

When you do the GR, insp lot will be created.

Former Member
0 Kudos

Hi Vittal,

Thanks for your inputs,

I have another issue related By-Product,

Can we trigger automatic inspection lot for by-product and can we assign batch to by-product. If yes please explain its setting.

With Regards

Former Member
0 Kudos

Yes,

Asssign the batch during GR and see that QM is active for the material concerned and task list is maintained, see that in OMJJ, for 531 mov tye(by product GR) QM is active if not pl come back.

Answers (0)