Go thru this documentation
MAKE TO ORDER AND MAKE TO STOCK notes
Make to order Scenario
1. Make-to-order production is a process in which a product is individually manufactured for a particular customer. In contrast to mass production for an unspecified market where a material is manufactured many times, in make-to-order production a material is created only once though the same or a similar production process might be repeated at a later time.
2. You can use make-to-order production: (a) For branches of industry or products where a small quantity of products with a large number of different characteristics are manufactured (b) When a product has to be assembled particularly for a sales order.
3. Stock keeping is not usually carried out for products that are made to order. In companies using make-to-order production, the demand program only determines the production area, in which various variant types are produced. Depending on how you track the costs associated with make-to-order production, there are two ways to process make-to-order items during sales order processing.
(a) Make to order using sales order
(b) Make to order using project system (not relevant for SD application)
4. for make to order production using the sales order, all costs and revenues involved for an order item are held collectively at that item. A particular rule is used that can be changed manually to transfer costs to profitability analysis.
5. make to order production is largely a production planning configuration. It is also controlled by the requirements type, which is determined by three things
the strategy group (MRP 3) in MMR
the MRP group (MRP1) in MMR
the item category and MRP type (MRP 1)
6. Make-to-order production is controlled by the requirements type. The requirements type is determined on the basis of the MRP group (MRP1) and the strategy group (MRP3) in the material master record. In addition, a plant must be assigned for make-to-order items in the sales order.
MAKE TO ORDER PRODUCTION (PROCESS FLOW)
First Create a material with MM
Basic data1:
Give Material name : Cycle
Material group : 010
Division : MA
Net Weight : 10 Kg's
Gross Weight : 10Kgs.
Sales: Sales org.1 :
Base Unit of Measure : EA
Delivering Plant : RAMA
Output Tax : 1 ( Full tax)
Sales: General/Plant :
Availability Check : 01 ( Daily Requirements)
Trans.,group : 001
Loading Group : 0003
MRP 1:
MRP Group : 020 ( Make to Order Production)
MRP type : PD (MRP)
MRP controller : 000
Lot size : EX ( Lot-for-Lot order quantity)
MRP 2:
In-house Production : 1
Schedule Margin Key : 000
Forecasting:
Forecast Model : D (Constant Model)
Accounting 1:
Price control : V ( Variable Price)
Variable Price : 4000
Price Unit : 1
Then enter & Save.
Material 769 created.
Create a Sales order with VA;
Order type : OR
Sales Organization : RAMA
Distribution Channel : RA
Division : MA
Sales Office : RAMA
Sales Group : RAM, .............. Enter
Sold to Party: 6000000000
PO number : 55 , PO Date : 04.06.2007.
Item Overview Tab:
Material 769, Quantity : 100
Enter & Save the Document.
Sales Order 8212 Created
Create Production Order with CO:
Enter Sales order number: 8212, Item No. 10
Order type: PP, Enter
Click on FLAG,
Select Generate Operation and enter NO,
save the Document.
Production Order Created: 60002725
Confirm the Production Order with CO15.
Enter Production Order No. 600075 and save the Document.
Now the confirmation Order will be saved.
Create Goods Receipts with MB31.
Movement type: 101
Order: 6002725
Plant: RAMA
Storage Location: RAMA
Enter and Save, you will get Document Posted: 50000068931posted.
Check the Stock Position with MMBE
Material: 769
Plant: RAMA
Storage Location: RAMA
Execute (F8), here we can see the stock at Sales Order Stock.
Create Delivery with VL01N, Billing with VF01 and Post to Accounts.
Make-To-Stock Production:
Purpose
we describe the planning of a product for make-to-stock production. After requirements planning, you analyze the stock situation and convert a planned order into a production order. You also enter a sales order that is not relevant to the planning. The production order is then released and saved. After the material withdrawals and confirmation of the operations, you analyze the production variances. The sales order is delivered and settled.
Process Flow
1. Planning a Product
T.code: MD61
Planned Independent RequirementsDemand Management Production Planning  Production Logistics Create
2. Creating a Sales Order
T.code: VA01
Create Order  Sales  Sales and Distribution Logistics
3. Executing Multi-Level Requirements Planning
T.code: MD02
Single Item - Multi-LevelFrom the MRP node, choose Planning
4. Converting the Planned Order into a Production Order
Tcode: MD04
From the MRP node, choose
Stock/Reqmts listEvaluations
5. Withdrawing the Material for the Production Order
T.code: MB1A
Issue Goods Movement  Inventory Management Materials ManagementLogistics Goods
6. Confirming the Production Order
T.code: CO11N
For Operation Enter  Confirmation  Production Control Production Logistics Time Ticket
7. Creating a Delivery
T.code: VL01N
Shipping and Transportation Sales and Distribution Logistics Single Document Reference to Sales Order Create  Outbound Delivery With
8. Creating a Billing Document
T.code: VF01
Billing document Billing  Sales  Logistics Create
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
97 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.