BPM with sofware component dependency issue

Former Member
0 Kudos

Hi ,

I have all abstract interfaces in the sotware component A and interface mapping,message mapping and BPM is in the Software component B.Software component B has the dependency with A.In my BPM container variables I am able to refer the abstract interfaces from the software component A.But in the transformertion step inside the bpm,eventhough the container variables and the souce , target messages interfaces refers the same interface and namespace it gives an error at design time. Is there any constraint in BPM ie: abstract interfaces which we have used in BPM should be in the same namespace where BPM resides.

Thanks in Advance

Regards,

Ravi

Accepted Solutions (0)

Answers (1)

Answers (1)

prateek
Active Contributor
0 Kudos

Ur integration process must be defined in SWC A.

There is a constraint. From help.sap

An integration process can only reference interfaces from its own software component version.

Regards,

Prateek