cancel
Showing results for 
Search instead for 
Did you mean: 

when i am creating slaes order system not picking cost

Former Member
0 Kudos

hi genius

When doing sales order system doest not carrying cost what could be the reason. I maintained Accounting 1 tab in material master standard price as 100 rs. And maintained in the prcing procedure control condition type as vprs. Although i am unable getting cost in the sales order . When am checked on conditons tab it is showing that as Zero. What is the reason for that

Thanks in advance

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

hi,

Check out whether costing is done for the material

Ck11 for costing

Ck24 for releasing it

This will update material master Inturn while creating the sale order this will update VPRS

regards,

arun prasad

Former Member
0 Kudos

Ya

I got it thanks for the answer