Make to Order Senario

Former Member
0 Kudos

Dear all,

Can any explain me what is MTO senario? Where it is used.

Is there any specific customizatio for MTO?

Also plz explain me the Customization for MTO regarding SD?

Plz send me the the solution fot the same.

Thanks & Regards,

Pankaj.M

Edited by: Pankaj Mahajan on Jan 1, 2008 7:08 AM

Accepted Solutions (1)

Accepted Solutions (1)

Lakshmipathi
Active Contributor
0 Kudos

Dear Pankaj

Go thru the links

[Make-to-Order Planning|http://help.sap.com/saphelp_46c/helpdata/en/84/f1064a01f011d295a90000e81d646f/frameset.htm]

[Make-To-Order Production|http://help.sap.com/saphelp_46c/helpdata/en/dd/5600b1545a11d1a7020000e829fd11/frameset.htm]

[Make-to-Order Production w/ Configuration (25)|http://help.sap.com/saphelp_46c/helpdata/en/cb/7f942743b711d189410000e829fbbd/frameset.htm]

Thanks

G. Lakshmipathi

Answers (1)

Answers (1)

Former Member
0 Kudos

Used

It is generally used in Slow goods moving Industry where the

Cost of production is high

There is lot of Variation in components Eg Stell rod of different sizes so as per the order cutting is done .

Hope this help

Make to order Scenario Details

1. Make-to-order production is a process in which a product is individually manufactured for a particular customer. In contrast to mass production for an unspecified market where a material is manufactured many times, in make-to-order production a material is created only once though the same or a similar production process might be repeated at a later time.

2. You can use make-to-order production: (a) For branches of industry or products where a small quantity of products with a large number of different characteristics are manufactured (b) When a product has to be assembled particularly for a sales order.

3. Stock keeping is not usually carried out for products that are made to order. In companies using make-to-order production, the demand program only determines the production area, in which various variant types are produced. Depending on how you track the costs associated with make-to-order production, there are two ways to process make-to-order items during sales order processing.

(a) Make to order using sales order

(b) Make to order using project system (not relevant for SD application)

4. for make to order production using the sales order, all costs and revenues involved for an order item are held collectively at that item. A particular rule is used that can be changed manually to transfer costs to profitability analysis.

5. make to order production is largely a production planning configuration. It is also controlled by the requirements type, which is determined by three things

the strategy group (MRP 3) in MMR

the MRP group (MRP1) in MMR

the item category and MRP type (MRP 1)

6. Make-to-order production is controlled by the requirements type. The requirements type is determined on the basis of the MRP group (MRP1) and the strategy group (MRP3) in the material master record. In addition, a plant must be assigned for make-to-order items in the sales order.

MAKE TO ORDER PRODUCTION (PROCESS FLOW)

First Create a material with MM

Basic data1:

Give Material name : Cycle

Material group : 010

Division : MA

Net Weight : 10 Kg's

Gross Weight : 10Kgs.

Sales: Sales org.1 :

Base Unit of Measure : EA

Delivering Plant : RAMA

Output Tax : 1 ( Full tax)

Sales: General/Plant :

Availability Check : 01 ( Daily Requirements)

Trans.,group : 001

Loading Group : 0003

MRP 1:

MRP Group : 020 ( Make to Order Production)

MRP type : PD (MRP)

MRP controller : 000

Lot size : EX ( Lot-for-Lot order quantity)

MRP 2:

In-house Production : 1

Schedule Margin Key : 000

Forecasting:

Forecast Model : D (Constant Model)

Accounting 1:

Price control : V ( Variable Price)

Variable Price : 4000

Price Unit : 1

Then enter & Save.

Material 769 created.

Create a Sales order with VA;

Order type : OR

Sales Organization : RAMA

Distribution Channel : RA

Division : MA

Sales Office : RAMA

Sales Group : RAM, .............. Enter

Sold to Party: 6000000000

PO number : 55 , PO Date : 04.06.2007.

Item Overview Tab:

Material 769, Quantity : 100

Enter & Save the Document.

Sales Order 8212 Created

Create Production Order with CO:

Enter Sales order number: 8212, Item No. 10

Order type: PP, Enter

Click on FLAG,

Select Generate Operation and enter NO,

save the Document.

Production Order Created: 60002725

Confirm the Production Order with CO15.

Enter Production Order No. 600075 and save the Document.

Now the confirmation Order will be saved.

Create Goods Receipts with MB31.

Movement type: 101

Order: 6002725

Plant: RAMA

Storage Location: RAMA

Enter and Save, you will get Document Posted: 50000068931posted.

Check the Stock Position with MMBE

Material: 769

Plant: RAMA

Storage Location: RAMA

Execute (F8), here we can see the stock at Sales Order Stock.

Create Delivery with VL01N, Billing with VF01 and Post to Accounts.

rewards if it helps