on 12-19-2007 10:47 AM
what is MRP ? its purpose?
Lakshm. No kidding. And he doesn't even give points when someone takes the time to give him an answer
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Deva Reddy
Deva Raj,
Please stop these basic question posts. You can find a ton of info in other areas and this forum is NOT the place.
If a moderator is reading this, can you please review this guy's recent posts (under both names above, he has 2 ID's) and take some appropriate action?
Thanks
Bill
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Materials Requirement Planning (MRP) is a scheduling procedure for production processes that have several levels of production. Given information describing the production requirements of the several finished goods of the system, the structure of the production system, the current inventories for each operation and the lot sizing procedure for each operation, MRP determines a schedule for the operations and raw material purchases.
Rgds,
Pankaj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
MRP - Material Requirement Planning
It is uesd to determine the SCHEDULE LINE.
SCHEDULE LINE = ITEM CATEGORY + MRP TYPE
Check the link
http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PPMRP/PPMRP.pdf
http://blogs.ittoolbox.com/erp/planning/archives/material-requirements-planningimplementation-8757
http://wiki.ittoolbox.com/index.php/Material_Requirements_Planning
Reward Points if useful.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.