In Project BOM , for two materil Main assembly not appear.

Former Member
0 Kudos

Hi All,

In project BOM , main assembly number not appear for two materials.

Can any body tell me the reason ?

Regards,

Ravindra

Accepted Solutions (0)

Answers (3)

Answers (3)

gerry_hodgins
Active Participant
0 Kudos

Hello Ravindra

The system works as follows During the BOM transfer to

project systems, if the materials are externally procured the transfer is stopped

The BOM explosion FM is being called with flag FBSTP = 'E'.

Flag FBSTP means limited multi-level explosion

This stops explosion at externally procured item.

Ger

gerry_hodgins
Active Participant
0 Kudos

Hello Ravindra

The system works as follows During the BOM transfer to

project systems, if the materials are externally procured the transfer is stopped

The BOM explosion FM is being called with flag FBSTP = 'E'.

Flag FBSTP means limited multi-level explosion

This stops explosion at externally procured item.

Ger

Former Member
0 Kudos

Hi, did you get some answer about this question? I have the same behavior.

Best regards

Jose Marin

fortian
Active Contributor
0 Kudos

Did you add the BOm using CN33 transaction?