We have configured one working day as our rounding-up period for shipping point in the system. This forces the material to be available one day before shipping for preparation and traffic time.

The abpve has worked well for us since we have been make to order company till now. Today we are moving towards keeping stocks for seasonal and fast moving items. Problem: In our current configuration, we can not ship on the same day even when we have stock. The shipping point will add the rounding-up period for all materials on a SO.

We would like to allow for same day shipping for in-stock items, as long as ATP confirms the qty. At the sametime, continue to add the extra day for shipping point for anything that is not in stock.

What can we consider to allow for such flexibility. I would appreciate any pointers or help to point a rookie in the right direction..

Thank you in advance,

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

hi,

u can achieve teh stocking scenario by creating a new shiiping point with 0 lead times (i assume u will continue with the MTO scenario too). for teh other requirement check the settings in ovz9- especially the tab 'recepits in the past'.

saurabh