Hello all,

I have a scenario with BPM. I receive from SAP an orderresponse this goes trough my BPM and finally a receiver must be exterminated. I do not want to do this within my BPM, so I do not want to uses branches with a condition. Otherwise I need to adjust my BPM every time a new party comes in and this makes the BPM slow. (I am talking about 30 parties).

So in what other way can I determine the party?

Thnx for the help.

Guido

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Have you tried looking at Enhanced Receiver Determination ?

http://help.sap.com/saphelp_nw04/helpdata/en/43/a5f2066340332de10000000a11466f/frameset.htm