Hello Experts,
I have posted a thread before with same issue it was answered by lakhsmi but i really need your advise can we control release strategies through user ids (i mean SAP User ID) Is this a good practice for an instance
User A can release any Preq upto x$
User B can release any Preq upto xx$
User C can release any PReq upto xxx$
Please if you can provide details in detail
Thank You
Justin
no SAP doesn't provide the release with the USER id's but if you can controll the release of PR by the dollar value. when you configure the Release strtegy for this charecterstics then you can assign the release codes to the user id who will be responsible for the PR release in this way you can controll the release of the PR.
hope this works
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I think he is not telling about the work flow,you requirement can be managed at the user authorisation level with the help of a Basis consultant.
the procedure is as follows,
Go to transaction SU01,
enter the user ID for which you want the control,
go to the Roles tab,double click on the MM role,
add the authorisation object M_BANF_FRG - for purchase requisition,
add the required release codes,generate,
and save
and go back go to user tab
click on user comparision,and save.
Hope this is help full for you,
Regards,
batchu
Hi,
We have the most complex release strategy setup in one of our clients' project ( in my entire experience, i can say this is the most complex one). In this, exactly the same I have recently designed a solution as you are looking for....
However, it can not be addressed in standard SAP. It requires User Exit usage.
In PO, of course, countless number of solutions can be developed in user exit (fortunately!!!).
How it works:
We have a ztable that provides the approval routes. For example, for a plant and porg combination, we maintain all possible Approvers' list ( Literally User Names). This approval route is one of the characteristics that determines release strategy. I designed multiple release strategies for all possible approvers for their limit values in $s. From the user exit, PO triggers a pop-up with allowed approvers for the plant and porg combination. User got to select one (else, we triggered error message) based on the selected Approver (approval route), it looks for release strategy applicable. Everything works fine...No issues about maintenance, if you create a z-transaction or z-table maintainable via SM30 in Prod system with limited access restricted to only COA maintenance person.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
9 | |
9 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.