cancel
Showing results for 
Search instead for 
Did you mean: 

Material PO text

former_member222613
Participant
0 Kudos

We have SRM 5.0 ECS R/3 6.0.

I create SC by PDP. In the PR in R/3 we can see the description of “material PO text” of the material master, but not in SRM SC.

We need to see that description in the SC.

is possible transfer this field from R/3 to SRM?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Raul,

Take a look of this threads, I hope this helps you

Regards,

José Luis D.

Answers (1)

Answers (1)

former_member222613
Participant
0 Kudos

10 points ¿siiiiiiiiiiiiiiiiiiii?