Using % statistical key figure in Cost center assessment


I would like to run assessment of some cost centers using the percentages as a receiver tracing factor. However, I wouldn't like to use fixed percentages method, because the client doesn't want to change the percentages in the cycle configuration.

The client would like to have the possibility to post statistical key figures which would be percentage ratios.

Is it possible to make the system check if the percentages sum up to 100%?