Hi Gurus,
Can we rerun availability check in R/3 4.7for an order replicated from CRM 5.0? If so what are the settings to be done?
Thanks in advance
Srinivas.
Hi Srinivas,
Yes u can run the availability check for an order replicated from CRM 5.0 to R/3 4.7.In the sales order VA02, in the menu choose EDIT->Check Availability.This shall show u the availability information provided all the avaibililty check settings are in place:
1. You have assigned the checking group in the material master (mm02), tab Sales: general/Plant, field Availability Check (put 02 if available)
Checking groups are defined in Transaction code OVZ2**
2. Configuring availability check controls.(OVZ9). Choose Availability check 02 and checking rule A.
3. Also ensure for the schedule line category (Tcode VOV6), the Availability check box is ticked or for the requirement class (Tcode OVZG),the Availability check box is ticked.
Regards,
Shalini Chauhan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.