Scheduling for labor capacity

Former Member
0 Kudos

Hi Guys,

While doing production order scheduling labor Work center is not getting schedule,it is showing warning message (No capacity category maintained in work center for scheduling).but i checked in the particular Work center the capacity category is maintain correctly .Because of this problem capacity requirement is not creating for the labor capacity.

please guide to solve this issue

thanks in advance

S.Murali

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi murali,

Capacity requirements will get generated through MRP

First check whether you have run MRP with Scheduling with option 2-Lead time scheduling

Regards,

SVP

I

Former Member
0 Kudos

Dear SVP,

I have already run the MRP with Lead Time Scheduling.

thanks

S.Murali

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi

Pl. refer my update on the same issue of yours .hope it clarifies your issue.

Regards

YMREDDY

Former Member
0 Kudos

Hi Murali,

to consider capacity for scheduling you need to do setting at two places in work center.

1) Make sure you have mainined correct capacity category in scheduling tab category LABOR.

2) in capacity header -> Planning details -> check relevant for finite scheduling.

please reply if this helps.

Regards

Manoj

Former Member
0 Kudos

Hi Manoj,

thanks for your reply

I have already maintain all required field correctly in work center.

thanks

S.murali