What is process through which schedule lines are cofirmed in Sales Order

Former Member
0 Kudos

What is the process through which schedule lines are cofirmed in Sales Order

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

Schedule lines get confirmed on the basis of backward or forward scheduling carried out by system based on Material Availability date.

Regards

SD

Message was edited by:

Samier Danish

Former Member
0 Kudos

In what way we can check whether the system is caluculating correctly or not in those backward or forward scheduling based on the materail availability date

Former Member
0 Kudos

hai man after ur slaes order u just go to vao2 find in environment there is avialablity check of material details in howuse production procurment repleshment lead time and back and forward scheduling u will be able to see the details