Hi,

How to run the consumption based planning (Reorder Point) for the group of materials. While MRP run system is considering all the material in the plant or MRP area.

How to run MRP based on the MRP type ??.

Thanks in advance

Vikram

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Vikram,

Plz gothrough the below link:

http://help.sap.com/erp2005_ehp_02/helpdata/en/7d/c2821c454011d182b40000e829fbfe/frameset.htm

It will clear all your doubts about CBP.

Reward if useful

Chandru

Former Member
0 Kudos

Hi,

To run MRP, you can use MD01. It is total planning in the plant. So, if the stock is below the reorder level, it will create requirement. In this all the mrp types will be select

( ex. PD,VB,..).

If you want to select specific mrp type, with help of user exit we can do. While running mrp, have to select that user exit key.

Reward points if useful.