Hi Friends

One of my material is extended to four storage location within a plant say S001 S002 S003 and S004 but here requirment is at the time of raising PO for this material,system should always propose only one particular storage location say S001. Is this possible

Need your guidance

Regards

VS

Former Member
Former Member replied

Hi Supergene,

In materiel master on MRP 2 you can give / define the default storage location for external procurement (MARC-LGFSB).

If you give the plant when creating the PO this SL will be written automatically by SAP.