on 11-13-2007 11:45 AM
Hi
Daily we r uploading FI Data using Delta upload
but yesterday records are more than 2crore (because of monthly closing)
from last 48 hrs it is running
how can i solve this problem
can u please guide me on this
EVERY THING AND ANY THING WILL BE REWARED
Thanks in advance
ravi
Make sure the job actually finished in R/3 side, go to RSMO and to the particular data source and go to detail tab. At the top, there is status in the Source system and Data warehouse. if the source system status is finished. If it is not finished then most likely the issue is from the R/3, may be no enough background processes. If the job finished in R/3 side then the issue should be from BW system.
If the job has been running for the past 48hrs, then it must be doing something, if there were some problem, the request could have timed out.
Either way, you just need to talk to your basis to figure out why it is taking too long either in source or BW system.
thanks.
Wond
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.