cancel
Showing results for 
Search instead for 
Did you mean: 

STO

Former Member
0 Kudos

can any body explain about stock transfer order, intra and inter by one step and two step processes.waiting for your valuable replay.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi RAMESH,

STO PROCESS:

STO is Stock Transfer Order & commonly used to transfer material from one plant to another or one Plant to Depot or Depot to Depot. There are different types of STO's:

1. Storage location to storage location within a plant

2. Plant to plant within a company code(INTRA COMPANY)

3. Plant in one company code to plant another company code (INTERCOMPANY).

STO CONFIGURATION:

The following steps have to be followed in order to configure stock transport order between two plants.

1. Create a vendor for the Company code of the receiving plant using account group 0007

via T-Code XK01.

2. In the purchasing data view assign the supplying plant and the schema group

3. Create customer with the sales area of the vendor.

4. The shipping conditions, the delivering plant and the transportation zone determine the

route in the STO.

5. In the pricing procedure determination relevant to the STO assign document pricing

procedure and customer pricing procedure to get the pricing in the invoice.

6. Maintain condition records for pricing condition.

7. Maintain carrier as a partner in the customer master.

8. In OMGN select the supplying plant and assign the company code and sales area.

Similarly select the receiving plant and assign the company code and sales area (The

company code to which the plant is assigned to).

9. Assign the delivery type and checking rule to the document type.

10. And finally, assign the purchasing document type to the supplying plant and the

receiving plant.

11. Create the STO using T-Code ME 21N and save.

12. Check for release strategy if any and release using T-Code ME 28.

13. Create delivery in background using VL10G.

14. If delivery is created, it is an indication of correct configuration and master data

creation.

Material should be maintained in both supplying and receiving plant MM01

Stock should maintain only in supplying plant MB1C

Create receiving plant as a customer in supplying plants company code and sales area

XD01

Assign this customer number in receiving plant details OMGN

Assign supplying sales area in supplying plant details OMGN

Assign delivery type NB for in combination of supplying/ receiving plants.

Create STO ME21N

As it is normal there in the item details we should get shipping date i.e customer number

Go for Delivery VL10B

Shipping point *****

Select PO go for execute

then select the delivery then go for delivery .create delivery,,,, delivery number generated.

Goods Issue VL02N

Delivery doc **********

Click on picking

enter the picking qty

Click on PGI

in the mean time check in the PO history you will get the details

Goods receipt MIGO

Stock overview the stock will be updated....

Followings steps are involved for configuring INTRA COMPANY STO PROCESS.

Intra Company STO Scenario: Plant B receives material from Supplying plant A.

1.create combination of Shipping condition, Loading Group and Supplying plant.

2.Create Customer master with sales org, Distribution channel and Division.

3.Assign customer master to receiving plant with same Sales area.

4.Assign Delivery Type and Checking Rule.

5.Assign Document Type, One-Step Procedure, under delivery Tolerance.

6.Make Sure Assignment of sales organization - distribution channel - plant

7.Create material master with purchasing view in plant B.

8.Extend material master with sales view to plant A.

9.In Plant A create STO (UB), with supplying plant. Check for shipping point XXXX.

10.In Plant B create STO (UB), with supplying plant. Check for shipping point XXXX.

11.Create delivery for XXXX shipping points.

12. Post Goods issue.

REWARD POINTS IF IT IS USEFUL

MCM

Lakshmipathi
Active Contributor
0 Kudos

Dear Ramesh

Go through the link which is self explanatory

http://help.sap.com/saphelp_46c/helpdata/en/4d/2b90dc43ad11d189410000e829fbbd/frameset.htm

Drill down for further details in the link.

Thanks

G. Lakshmipathi