Hello,
I ran template - configure SLD with NWA.(1st step) and remaining steps are manual and not necessary for PI/
And also Ran PI installer all 10 templates. I got all import successful messages. But, When i touch ABAP, Though it si saying import successful it is giving message
"Element SAPDEMO.<SID>. Backend unclassified
ABAP. configuration.FM.Call
SXMB_Register_queues
ABAPconfiguratorwriter succeeded"
What is this mean and is my SLD has been configured.
Thanks,
Srinivas
Hello Barry,
I used 001 for PI configuration since it is meant for developmet. In my case, i don't need to do client copy.
As i am new to sap, how do client copy. May be it will be useful in future.
If i do copy 001 to 100 now, So all the configurations also copied to 100. Hope i am correct. I will try it, once i am ready with 001.
Thanks for help,
Srinivas
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You should not use Client 001
There is a post-installation step to create a new client.
1. SCC4 --> Create client no. and fill other details.
2. Logon to the newly created client with SAP* and PASS as password.
3. SCCL --> choose any profile (preferably SAP_ALL), source client 000 and target client <as created just now>.
4. Preferably do a test run initially to check if it can go well.
Thanks Barry,
I have one doubt. When i do these steps, i have to login to SAP XI client 001 as PISUPER and exceute them.
If i want to login to ABAP side, hope the client and PISUPER are same.
Is any place i have to use other than PISUPER.
Ans I believe these steps are done by template installer. Anyway, i will check manually once again as suggested.
Thanks,
Srinivas.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Barry,
Yes. My SLD is local. I Just done all the steps as per template installer.
NWA-- configure SLD and PI -- all 11 steps.
Though i got some message, but all the imports are successful
How to register all the PI components in SLD. where is this step comes. And please help how to do it.
I am going though Post- installtion steps in XI30 installation guide from page31, I would like to know do i need post-install of SLD before i start PIpost-install.
Thanks in advance for your help,
Srinivas
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
The post sintall steps are to:
Create RFC connections - LCRSAPRFC and SAPSLDAPI
Add entries to SLDAPICUST
Add URL, user and password to ExchangeProfile
Enter JCo RFC destrinations in Visual Admin
Add SLD Data Supplier URL user and Password in visual Admin and replicate with SLD (Test Data)
Run RZ70 in ABAP
Once complete run SLDCHECK in ABAP...
This is a really useful Problem Analysis Guide for errors:
http://help.sap.com/saphelp_nw04s/helpdata/en/78/20244134a56532e10000000a1550b0/content.htm
If you need any help just ask!
Is the SLD Local? have you completed the post installation tasks of SLD? Have all the PI/XI COmponents registered in SLD?
I never trust the template isntaller, not all the CIM objects register successfully al the time, therefore certain manual associations are required. There is an OSS Note 764176 that helps.
Have you completed the post installation tasks in PI/XI?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.