Hello all,

there is a prd order, for which if the Material availability if triggered it comes to the status MACM (mat comitted).

{the ck grp "02" ( blk Q.req - not checked and accumulation -3). check control -include Saf.stock, include Stk in transfer, include reservations and include deliveries, dependent avail ck 'include all reservations' , chech without RLT, no storage loc inpection and include recepts from future and past}

But when collective availablity is checked thro COMAC (ATP and resetting), the order gets the status MSPT. (actually this is correct).

why is the difference?