there is a prd order, for which if the Material availability if triggered it comes to the status MACM (mat comitted).

{the ck grp "02" ( blk Q.req - not checked and accumulation -3). check control -include Saf.stock, include Stk in transfer, include reservations and include deliveries, dependent avail ck 'include all reservations' , chech without RLT, no storage loc inpection and include recepts from future and past}

But when collective availablity is checked thro COMAC (ATP and resetting), the order gets the status MSPT. (actually this is correct).

why is the difference?

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Do you man transaction transaction - MDVP.

In the transaction - use I - indivisual checking accouring to material and execute, it will work.

Former Member
0 Kudos

is it resolved?