Integration revenues and earnings in project system

Former Member
0 Kudos

Hi,

can anybody send me documentation about the integration between SD and PS?

thanks

my email is davidip1975@gmail.com

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi David,

Project System(PS) works for any project e.g construction, operation or any large projects where project management tools are required. it integrates all modules may be like MM for vendor process or for RFQ etc or say may be SD for Resource related quotation with the help of DIP profile or Milestone process etc. IT is largely used in construction projects. IT helps in controlling the whole of project from one single screen and it works with 3 elements WBS element ( work break down structure), Network and Activity.

Please go throgh this Please check this links perhaps they may help.

http://help.sap.com/bp_imcv1500/IMC_US/HTML/preconfigured_scenarios.htm

ETO:

http://help.sap.com/bp_imcv1500/IMC_DE/HTML/E83_EN_DE.htm

http://help.sap.com/bp_bblibrary/500/HTML/E46_EN_DE.htm

MTO:

http://help.sap.com/bp_bblibrary/500/HTML/V66_BB_EN_US.htm

http://help.sap.com/bp_imcv1500/IMC_DE/HTML/E70_MTOQuotProc_EN_DE.htm

PS - SD integration are on

1.Billing pan, at each WBS element, network and Activity level.

2. DIP profile which is assigend to item category. DIP for resource related quotation works only with ECP ( easy cost planning).

3.sales pricing - generally, there r 2 types of sales pricing in PS . lumpsum contract and unit rate contract.

4. BOS - bill of Services. which has to be activated. It is industry specific solution. If BOS is activated you also have integration for vendor RFQ and Analysis.

5. resource related Billing

http://help.sap.com/saphelp_46c/helpdata/en/aa/96853478616434e10000009b38f83b/frameset.htm

Following is the SD & PS integration scenarios where milestone billing & Periodic billing plays the implortant role for these integration:

Milestone billing is typically used for billing projects, such as plant engineering and

construction projects. Such projects often include a series of milestones that mark the

completion of different stages of the work. In the SAP R/3 System, milestones are defined

in a network along with planned and actual dates for the completion of work. The milestones

are also assigned to the billing dates in the billing plan. The connection between the project and the sales document item is made in the individual

schedule lines of the item. Each schedule item can be assigned to a network in a project.

PS-SD Integration as below :

A)Billing plan, at each WBS element, network and Activity level.

B)DIP profile which is assigend to item category. DIP for resource related quotation works only with ECP ( easy cost planning).

C)sales pricing - generally, there r 2 types of sales pricing in PS . lumpsum contract and unit rate contract.

D)BOS - bill of Services. which has to be activated. It is industry specific solution. If BOS is activated you also have integration for vendor RFQ and Analysis.

Reward points if find useful..

Regards..

Praveen Kumar.D