cancel
Showing results for 
Search instead for 
Did you mean: 

MIGO subcontracting PO - SLED

Former Member
0 Kudos

I have one more question ...

In MIGO for creating GR against a subcontracting PO

It gives an error message "shortfall of 134 days against SLED in current item(xx/xx/xxxx)gives the date.

Do i need to change the SLED date?

Iam testing the transaction and maybe Iam giving a wrong data. Please let me know how to solve this error.

Thanks

VV

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

that message is related to shelf life expiration number of days set in the material master storage location data view. what it means: based on the minimum number of days remaining required, maintained in the material master, the system calculates from the date of production you entered in the MIGO. You may change the actual date of production in MIGO to at the maximum to current date, to allow it post for you (if it is just some test system),. In production system, however, it means that you are receiving an expired material ( or with a shorter life than minimum required to receive). check and correct the date of production if required in MIGO. If master data is incorrect, go and change the material master shelf life.

Reward points if it helps!