cProjects Planned costs display

Former Member
0 Kudos

Can you display planned costs in cprojects after doing financial integration(Calculated on Role/Task revenue rates) against each phase or task without going into each individual task separately.

Which all options of displaying planned costs are available and how are these configures ?

Is this carried out via the planning mechanism chosen Role-based resource planning or Task Based.If yes, Where do you specify which of the 2 options to choose ?whether you want to choose role based or task based planning.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hai Pooja

Costing is carried out in cProjects based on the project roles r tasks.

Reg tasks based cost planning u can assign the required capacity to the individual tasks during the planning of the project structure.This required capacity is multiplied by the cost/revenue rates ti determine the planned costs and planned revenues.

Task is done by a role - means for example Project Manager specifies which positions are to be filled up - these positions are called in cProjects as Roles(resources for the project). Thye are assigned to the tasks in which the positions are involved.

Check the configuration in - SPRO - cProjects - Connection to external system - Accounting Integration - Integration using Single Object Controlling in SAP R/3 CO - Make General settings

ENJOY mySAP PLM

Regards