Hi all,

Can anyone throw some light on where do we assign profit center in Material master?

thnx

Shravan

Accepted Solutions (1)

Accepted Solutions (1)

former_member197269
Active Contributor
0 Kudos

You need a profit center and it must be assign into material master at sales:general data view

http://help.sap.com/saphelp_ides/helpdata/en/b7/c43a289d5411d189b60000e829fbbd/content.htm

hope this helps.

pls assign points as way to say thanks

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Shravan the following configuration steps may useful to u

3 Configuration

3.1 Master Data

3.1.1 KA01 Create Additional Cost Elements - New

Use

Create all cost elements manually as described below.

Prerequisites

The accounts for these cost elements already exist in the company code. This has been configured by installing the Core Financial Accounting building block.

Procedure

1. Access the activity using one of the following navigation options:

IMG Menu Controlling  Cost Center Accounting  Master Data  Cost Elements  Individual Processing  Create Primary Cost Element

Transaction Code KA01

2. Activities: Enter cost element key and valid-from and valid-to date, then click button Master data and enter remaining data. Then choose Save.

Give me points if u satisfied...

Dasharathi

Former Member
0 Kudos

Thanks Ravi