<b>Is it possible to combine different outbound deliveries for the same ship to party and pack it in a single packaging material? The ship to party remains the same and also the shipping point.</b>

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi

Packing fr the material in the Delivery can be do with the same packing mataerial when te materials belongs to same material group and material are to be delivered in the same batch

so it is possible for the material with same material group and with the material having the saeme batch number

Using the packing function, you can enter information on how the products to be supplied should be packed or were packed for a delivery.

For the different packaging materials (boxes, packaging containers or pallets), material master records are created with material type VERP, which contain fields (for example, the allowed packing weight or volume).

Individual items or subsets of an item can be packed into a shipping material with the help of a handling unit, which in turn can be packed into other shipping units in a multi-level procedure. You can control, for each delivery item category, whether the item can be packed at all and whether it must be packed.

To be able to use the packing function, you must set the configurations for the following points:

hope it is helpful

bcrao
Active Contributor
0 Kudos

in shippment doc we can combine diff del doc and do packing