Hi,,

i have a production order for 10 quantity and after production i have done GR for that Production order using 101 movement type for 10 quantity. i want to reverse the GR for 2 quantity. it is not allowing me to do it.

Is it possible to reverse partial quantity for GR made.

ERROR message : enter valuation type,

though i entered the correct valuation type.

pls suggest

regards

madan

Accepted Solutions (0)

Answers (9)

Answers (9)

Former Member
0 Kudos

Hi Madan,

Please consult your MM consultant. He will definetly solve this.

Regards

Krishna

Former Member
0 Kudos

Hi,

i have production order for 10 quantity and 10 quantity i havr done GR with 101 MIGO .partial reversal of GR is possible for a production order with movement type 102 in IDES for only 2 quantity.

but in my production system it is not happening for partial reversal. it is saying valuation type problem.

pls suggest me

regards

madan

Former Member
0 Kudos

Hi,

You can do Partial Reversal for the Production Order even after CNF state.

But I gave you a general practise.

You may have to do some error analysis, for your case.

Regards

Krishna

Former Member
0 Kudos

hi,

thanks for your reply

i do only manual GR for a production order.

according to you u mean to say that partial reversal of GR is not possible.

i have to cancle the whole document and do again the GR for the required quantity.

is it what u mean

regards

madan

Former Member
0 Kudos

Hi Madan

How do you do GR for 2 pc? Auto GR or Manual GR

if AUto GR then cancel the confirmation with t.code Co13 , material document will get reversed

IF Manual GR then cancel with MIGO or MBST

Cheers

Bala

former_member184627
Active Contributor
0 Kudos

Hi,

You can t.code MBST & cancel the GR. Then do MB31 with 8 as production qty.

Regards,

Senthilkumar

Former Member
0 Kudos

Hi Madan,

Cancel the confirmation. If it is auto GR you need not do any thing all the 10 quantities will be returned back. Or you do the Reverse GR for 10 by mvt 102 against the order. Then you reconfirm the order for 8 quantity followed by GR for 8 quantities.

Regards

Krishna

Former Member
0 Kudos

Hi,

is that I have to reverse 10 quantity and do gr for 8 quantity. against what i have to use 122 movement type.

regards

madan

Former Member
0 Kudos

hi,

you cant reverse gr partially, instead you can go for gr return and then return 2 quantity. movement type for gr return is 122.