on 10-17-2007 5:24 AM
Dear Team,
We had upgraded BI system from 3.0B to BI 7.0. At the time of upgrade dev
copy(shadow system) logical system was not changed because most of the data is coming from ETL. Now we want to test the extraction from R/3 Dev.
R/3 Dev is already connectwed to BW dev 3.0B, Now we need to test
extraction from R/3 Dev to BW dev copy server( NW2004SR1 ).
Here we are facing a problem with Logical system. While upgrading the
same logical sys was copied to BW dev copy.
What is the procedure to change the existing logical system name in BW
dev copy and establish connectivity with R/3 dev?
what is the impact if we run BDLS transaction.
Thanks& Regards,
Satish.K.Neni
Hi,
To change the Logical system name in BW you need to use the T-code BDLS (NEW T_CODE IS BDLSS).
For Details on BDLS Please refer
SAP Note 121163 - BDLS: Converting logical system names
SAP NOTE 325525 - Copying and renaming systems in a BW environment
SAP Note 195610 - Logical system name conversion in T000
Regards,
Prem
Message was edited by:
Premkishan Chourasia
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You can use Transaction SALE goto Basic Settings -->Logical systems -->Define Logical Systems / Assign Logical Systems to Client.
Hope this is useful
Regards
Umesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
11 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.