project subcontracting

Former Member
0 Kudos

hi all

i am doing Subcontracting with AAC Q and item category L....

PO is Ok.

in MB1B system is giving error that PO is nt having ne items ....

i maintained Q with L also in combination in SPRO..

What are the steps required?

SAP MM

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hii

Do even check whether the delivery type is "LB" in config for the supplying plant.

SPRO-MM-Purchasing-Purchase order-set up sub contract order

Reply if ur problem is solved

Regards

pramod G

Former Member
0 Kudos

Hii

1) check whether you have explodede BOM in PO.

2)Check whether the components are available in stock (MMBE)

3)Usually this error comes when the GR is made for the PO

Thanks

Pramod

deiva
Active Contributor
0 Kudos

Hai,

Check the stock of child materials using the TCode MMBE, to be provided to the projects.

Former Member
0 Kudos

hi

i hav checked everythg and find fine.....

i thk some special setting is required for AAC Q in subcontracting case.....

SAP MM

Former Member
0 Kudos

Hii

let me know what is the availability check used fot the mvt 541 and tcode MB1B

Img-MM-IM&PI-GI/Trans posting-set up dynamic availability check-

a)mvt type ( consumption posting "P")

b)checking rule

c)define checking rule

d)Tcode(MB1B checking rule "PS")

plz revert back

regards

Pramod

Former Member
0 Kudos

hi

i havn;t maintained ne thg special related to project in ths setting....

tell me about that....

sap mm

Former Member
0 Kudos

Hii

Check what is the Availability check used in material master then

try doing this settings in ur config using this path

Img- MM -IM&PI- GI/Trans posting-set up dynamic availability check-

a)mvt type ( consumption posting "P")

b)checking rule- 01 (standard)

c)define checking rule (assign 01 to PS) also in standard

d)Tcode(MB1B checking rule ="PS") assign

plz revert back

regards

Pramod G

Former Member
0 Kudos

hi

i am nt able to maintain first setting of consumption posting in spro as there is no option of new entry and change in ths ....and one thg more Do i hav to good issue with 541 movement type in case of project subcontracting?????

SAP MM

Former Member
0 Kudos

Hi,

Check the stock for items.

Thanks

suresh

Former Member
0 Kudos

try to elaborate .....

as what are the requirements ??

SAP MM

Former Member
0 Kudos

hi,

Check the stock of child items in BOM of the subcontracted material they should be avl in project stock to issue to vendor.

Thanks

suresh