cancel
Showing results for 
Search instead for 
Did you mean: 

PGI

Former Member
0 Kudos

hi to all,

can any body help me, i saved delivery document safely bt un able to create PGI PLS let me knw the reason.............

Accepted Solutions (0)

Answers (7)

Answers (7)

Former Member
0 Kudos

hi,

put ur query in a right way. u cannot save the delivery document safely

without doing pgi.

KR

Lakshmipathi
Active Contributor
0 Kudos

Hi Ravi

You can certainly save a delivery document <b>WITHOUT</b> doing PGI. Check at your end by going to VL01N and save. System will give a delivery document number.

Thanks

G. Lakshmipathi

Lakshmipathi
Active Contributor
0 Kudos

Hi Reddy

Before doing PGI, check whether storage location is flowing against the material. If not, enter the storage location and do PGI.

Thanks

G. Lakshmipathi

Former Member
0 Kudos

hi,

check

1.have u enter pick qty in delivery document

2.if u maintain serial no profile,give serial no

3.if u maintain packing mandatory in delivery item catagory, then u pack first then do PGI.

What error message u get it..elloborate it.bye.

MCM

Former Member
0 Kudos

Hi Reddy,

There are different reasons for Unable to do the PGI.

1.Give the shipping point correctly.

2.Mention the Selection date as Material Avilable date.

3.Mention the Plant corrctly.

4.Mention the storage location and the deliver quantity.

5.Please check the period is open or not for the current month.

6.The most important is Whether the material is confirmed in the sales order or not?

If u maintain these all, most of the errors in the PGI may vanish,

regards,

vas.v.s.

.

Former Member
0 Kudos

Hi Reddy

Can u elobrate it, as what error system throws when u create PGI

Regards

Former Member
0 Kudos

Hi,

What is the error you getting. Can you put the Error message number.

Regards,

Murali

Former Member
0 Kudos

Wts the message coming