cancel
Showing results for 
Search instead for 
Did you mean: 

Quality level in locked

Former Member
0 Kudos

Hi everyone

I have a problem while giving the usage decision for a particular inspection lot

The system status is CRTD PASG SPRQ.

The plan already exists for the material and also the plan has been assigned to the inspection lot, but when i am trying to save the changed lot it is saying

"Operation cannot be prossesed-quality level is locked".

Only for a particular material 'x' this is happening

Can someone please help me out it is urgent

Thank you

kavitha

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi

did you try withQDL2 (Change quality level)?

check, how it goes.

regards

Srinivas

Former Member
0 Kudos

Hi

Yes i have tried to change the quality level,

but could not get teh problem resolved.

It still says Quality level is locked while trying to save the inspection lot

after assigning the plan and sample size tot the inspection lot.

Thank you

kavitha