Hello SAP Gurus,

I am trying to amend the details so that the report in KE30 would match that of the CK13N in terms of material, labour, overheads. At the moment the KE30 report is classing one of the materials used for the product as stock hence taking the labour & overheads for that particular material into the the total material cost for the product.

The product in KE30 includes a part (242/20793) which is a made inhouse part which is classed as a stocked item then picking up labour & overheads for 242/20793 into the final product's material costs

The same product in CK13N gives material cost elemnts in detail for the product showing 242/20793 as a part and displaying the labour and overhead for each part used for the product and detailing the labour & over head for each part including 242/20793. Making the total for labour and overhead between both reports different as KE30 has the labour & overheads for 242/7093 in its material.

What do I do?