Transaction Code Required

Former Member
0 Kudos

I have maintained planning periods for my info structure as weeks in MC7F....because of which data is uploaded in weeks format

But is there any transaction which shall enable me to view this months format??

How do i view my forecast in months format instead of week

Rgds

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Create a planning type for the info structure with the required key figures using MC8A.

Enter the planning table using the same planning type with T.code MC94, then go to Edit--period splitting-- Total--- Months

Hope this works for you.

Former Member
0 Kudos

Ratan

In MC94; there is no such option available for editing.i.e. there is no option of period splitting available..Is it MC94 only?

Please check it..and tell me....

Rgds

Former Member
0 Kudos

I think this works only if there are no periods defined in the infostructure in MC7F.

You can change the period unit of either the entire planning horizon or a preselected part of it on the following conditions:

The planning method of your information structure is level-by-level (standard SOP or flexible planning).

No storage periodicity has been defined for the information structure in Customizing (in Set parameters for info structures and key figures).