What is mean by Master Plan Report ?
This is something used to generate master plan forecasts.
Please share your view / other information / T-code related to this ?
Hi,
As far as i'm concerned, i hope u mean to say "Master Plan Report" as "Master Production Scheduling - MPS ".
Here is some points:
The aim of MPS is to reduce storage costs and to increase planning stability. This is useful in the following cases:
- To ensure that there is good material availability, various floats and a safety stock are entered, which inevitably lead to high stock levels. Thus, high storage costs are incurred, especially for valuable materials.
- The master plan of these materials greatly influences the entire production process: The planning of the dependent parts depends on the planning result of the finished products and main assemblies, even if the finished products represent a small share of all the materials to be planned. Frequent changes at finished product level can render the complete MRP run unstable.
Check up the foll. link too :
http://help.sap.com/saphelp_47x200/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
- Thaila Shree
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.