cancel
Showing results for 
Search instead for 
Did you mean: 

assign plant to company code

Former Member
0 Kudos

Hello,

I am trying to assign plants to a company code and i get the message:

"Company code and rating code must be the same. Message no. CZ290"

I have set valuation level at company code.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Dear

Could you please let me know on which client you are working .If you working in Test client then first remove the assignment of plants from the company code and then set valution area as the palnt.

and reassign the plant to Company code.......

Regrads

sunny

Answers (4)

Answers (4)

Former Member
0 Kudos

Dear Thanos,

Do one way go to EC01 and check your organisation structure and what data still have and what data not it shown and do the assign or creation of what data you dont have

here shows total updated data

Hope this helps you

Prem.

Former Member
0 Kudos

Problem still exists.

I cannot assign the new plants to the company code, but the original plants that the new plants were copied from, were assigned to the company code.

former_member218067
Active Contributor
0 Kudos

Hi,

Please check the controlling area settings

Is your controlling area same as plant?

BR

Diwakar

former_member218067
Active Contributor
0 Kudos

Hi,

  • earlier reply

Not as Plant as company code?

BR

Diwakar

Former Member
0 Kudos

Hi Diwakar,

the controlling area is same as company code.

I don't think that's the problem.

Thanks anyway

Thanos

Former Member
0 Kudos

1.In your project if you are using PP/Product costing,you must use valuation area as plant.

2.If it is IDES System,also you have to use valuation area as plant.

If it is not there,

Then Is there any plant(s) had been created with valuation area as plant level before you are created your plant.

Please let me know.

regards

venkadesh

Former Member
0 Kudos

dear Venkadesh,

the point is that valuation area must be at company level, so I cannot change that...

Correct me if I am wrong, but valuation level is set once in the beginning, so no plant could have been created with valuation area at plant level (if valuation area can be changed afterwards, I would like to know the way for future installations).

Regards,

Thanos

Former Member
0 Kudos

Hi

When u create plant( Through copy) use check option to check whether all assignments are copied correctly If not delete same and copy with reference to another plant

Reward if usefull

Vishal....

Former Member
0 Kudos

Delete existing plant.

Define plant again and copy from existing one and assign to company code.

Regards

Ravi