10-10-2007 8:45 AM
I need to call Material in change mode (i.e. MM02). I have check boxes in first column and Material numbers in second column of ALV Grid output. I set pf_status 'Change Material' (&NEXT) in application tool bar. the user has to check what ever the Materials required and call MM02 that many times. please provide logic for same.
Thanks in advance.
Zakir.
10-10-2007 8:53 AM
Hi,
case sy-ucomm.
when NEXT.
u take a loop .
In that loop wherever u want
call transaction MM02 .
Assign points if useful.