Take into consideration the users have the possibility of using the material status to monitor the life of a material.
can anybody answer whether material determination could check the material status or the launch date and end dates( if maintained in Material master), via user exit??
or if it is required to do a system modification in the material determination function to add this requirement??
please give a solution to my query
thanks,
ramesh
Hi Venkata
Material determination is its swaps the obsolute material with new material.
Here there is no need for userexit.
But still if u want to know the Valid date and end date of the material. U can maintain these in Materail master.
Go to Plant data/storage 1 View:
Below u will see the SELF LIFE DATA.
ENTER
The Max. Storage period
Min. Rem shelf life life
Reward if useful to u
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ramesh,
Can I know the reason you need the end date and launch date. We had a similar requirement to take into consideration the validity date. So we created a customized program to upload the material determination records. The program was enabled to delete the records based on the validity in th excel file.
Hope this help
beena
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.