cancel
Showing results for 
Search instead for 
Did you mean: 

materaial determination

Former Member
0 Kudos

hi

can the material determination can check the status of the material ( if the material launch date and end date maintained in the material master)

if not can we do the same by using the USER EXITS??

Is there any user exits provided by SAP in material determination

OR we need to go for the system modification

help me out by giving some solution.

thanks

ramesh

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

Check the requirements routine in the transaction VOFM..

In the transaction in VOFM..

REQUIREMENTS -> MATERIAL DETERMINATION..

create a new routine there..check for existing routines..Then assign this routine to the material determination..

Thanks

Naren