Hi All,

We have upgraded from 4.6c to Ecc 6.0.

We had ESS thru Standalone ITS and services were developed using Web@Studio

Now if we want to migrate it ECC6.0 integrated ITS What all the steps required.

Pl. guide me in doing the same...

its very urgent

rgds,

Kiran Joshua

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos
Former Member
0 Kudos

Hi,

Hope this document would be useful.

https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/bd62e390-0201-0010-2bba-d0120ffa...

Award points if helpful.

Thanks,

Tanuj

Former Member
0 Kudos

Hi Tanuj,

Thank you for the doc, i have refered the doc already.

The doc says about "Copy existing templates" what is meant by copying..

Can you please guide me .

i cud not see some of the old services in the new ecc6.0 SICF transaction

pl. suggest.

rgds,

Kiran Joshua