on 10-09-2007 3:59 PM
Dear All,
I have to solve the following scenario:
There are two sites A and B having a two step transfer procedure. I have transfered 50 pieces of an item from Site A to Site B. The stock is now present in the Stock in transit qty. Then i have done a Goods receipt of 25 pcs of the item in Site B.
Now i want to reverse the remaining 25 pieces back to Site A. I do not want to do it with respect to any document. I would prefer it to be like in Transfer posting without a refernece. Is there any way to solve this ?
Regards
Prabhu
Hi Prabhu,
Partial Reversal of Delivery is not possible in two step transfer procedures. You will have to cancel the GR document through MBST then do the reversal of the Delivery through VL09 and change the Delivery Qty to 25 through VL02n and do the PGI again. After that you can do the GR for 25 at Site B.
If your requirement is like this you can Opt for a Site to Site transfer option with Mvt type as 311.
Regards,
Vinod.