on 10-09-2007 8:04 AM
Hi friends,
I have created a trigger point in routing and mentioned create order with reference. I have mentioned all the necessary parameters.
ISSUE: When I am confirming the operation of the production order, the above one is getting triggered but the order is getting generated without the material number?? Why so?? Also one more thing is that I am entering the yield qty and rework qty and I want the rework order to be generated but a normal order is getting generated??
Kindly help.
Naren
Dear Narendra,
Hi, I am Manish Phatak.
In trigger points process mapping, the rework order will be created without material only. This is the standard SAP. This is being so as to settle the rework costs to the original prd ord from which the rework ord is generated.
Your 2nd question----- Can u elaborate me more????
Please contact me if any doubt.
Reward properly, if u are satisfied.
Regards,
Manish Phatak
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi All,
Can anybody help me the Config on Batch Management with the screenshots.
Required Urgently. Also pls. let me know if QM is also activated will there be any changes in the config. of Batch Management.
Regards,
Aashish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
1. First create a Reference op set in tcode Ca11.
Enter the plant,Description , usage and status
for the ref op set
Enter lotsize and unit of measure.
Enter the op as 0010 / workcenter/op control
key/Description for the op
Enter the standard values and save.
2. Create a Standard trigger point in CO31.(Ex
Production)
Enter the Trigger Point usage /Group as FERT.
3.Tick the Trigger Point Functions.
4. Enable the indicator create order with Reference .
5.Enter the system status as PCNF.
6. Enter change as +.
7. Enable the indicator once.
8 . Now place the cursor on the create order with reference.
9. Goto Parameters.
10. In the Parameter enter in the group the created Reference op set group no.
11. Order type as PP01 and group counter as 1 and save the Trigger Point.
12. Now goto the Routing for your Material.
13. Choose the last op to assign the Trigger point.
14 .Select the OP -
> Goto ---> Trigger Point overview.
15. Enter the Trigger Point usage as FERT.
16.Now choose that line ,select the Details---> Trigger Point
17. The system will says standard trigger point exists from which you can
select the created Trigger Point (EXx Production)and save.
18. MD02/MD04.
19. Convert the Planned Order into Production Order and Release the order.
20 .Now confirm th ops.
21. For the last op enter the yield and rework qty
and set the status as PCNF.
22. If the status of last op is PCNF then in the
system a POP UP will appear as Activited by
Trigger Point /Create order with reference/order
number/sequence and op number which trigger point
works and enter.
22. Now a rework order will be created.
23. In c003 enter the number which is next to the actual prodn order no.Rework
order will be seen.
Pls reward if you found useful
Regards,
nandha
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
For rework order following settings are required
Trigger point with following setup(check in CO32)
Usage - tick trigger point function
Trigger point function -
check box - create order with reference
Status = PCNF
Change = *
Once - keep it blank
Activa = 2
Group and counter= reference operation set.
Order type- can be same order type or can define one more order type for clarity.
Assign this to the operation where you want the trigger...by copying the std trigger point(not just assign)
With this set up
When you confirm the order, if rework qty is entered in CO11n, System will create a rework order after popping up a message for your decision to create a rework order.
The rework order qty = what qty you have entered in rework qty in CO11n screen.
Order will be created w/o material and settlement rule is define as the cost receiver is superior order from which this rework order is generated.
This is the std SAP behavior.
Please come back if the question is not answered.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Rajesha and Nanda,
Thansk for reply. I am now getting the rework order when I enter the qty in rework in CO11n. As per ur mail the order which i get is without material.
What is the use of this order as when I confirm that order using co11n, the stock of the parent material does not gets updated??
Why dont we get the rework order with the parent material..please reply.
Naren