Hi all,

The scenario is as below:

I have a material (halb). I have maintained a BOM. Now, i donot have a routing, but i just use a reference operation set.

In this case, when i run the standard cost estimate (t code CK11N), the master data is read. But, since no routing exists, so the activity costs wont be read. So what should be done in this case, so that the costs as per the activity in ref. operation set is also captured?

Shrenik

Former Member
Former Member replied

Shrenik,

If the Referance Operation Set is standard and same is going to be used always, please <b>enter that details of the Ref. Opn Set</b> in the <b>costing 1 view of the material master under Quantity structure data.</b>

Regards,

Prasobh