on 10-06-2007 11:47 AM
Hi Guru's
I created two costing sheet
Y001
Y002
I have two type of productions
P001
p002
Prodction Order P001 Costing Sheet Y001
Prodction Order P002 osting Sheet Y002
When Run prodction order P002 system is showing y001
why
pls sugges guru's
it is vey urgent
Hi
Check the costing variant what costing sheet you maintained in Overhead tab of valuation variant.
Thanks
Ansuman
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
If your requirement is that you want use these two costing sheets for two types production.
You have to create two different costing variants. Assign these relevant costing variants to the order types in the following path
Product Cost Controlling->Cost Object Controlling->Product Cost by Order->Manufacturing Orders->Define Cost-Accounting-Relevant Default Values for Order Types and Plants
then create the production order, you would get the costing sheet as per your requirement.
The costing sheets has to be assigned to the costing variant which i understand you would be aware of...
Assign points if the solution is found usefull.
Regards,
Suraj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
88 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.