check on delivery with CNS0

Former Member
0 Kudos

Hi gurus,

I have the following problem.

I have a material that I buy directly from wbe/network. The same material must be sell. If I use CNS0 for delivery from a project, the system creates the delivery and post the good issue even if the material has not arrived.

Can I block the good issue, in some way, the good issue until the material has arrived?

Thanks in advance

Regards

Raffaele

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Once the material is available in project stock & in respective date, then only materials can be delivered. Without materials, delivery is n't possible. Please check from your end.

Regards,

Rakesh