cancel
Showing results for 
Search instead for 
Did you mean: 

packing process problem as below

Former Member
0 Kudos

i m doing the packing process but there are two error is comming

wen i m doing packing ccan any body tell me the process of packing

i m doing in below process

i ve doubt wat is the packing material group

and wat is the type

which one is bigger

and wat is the packing material

the error is coming as

in 1 loop no packing proposal data can be determind

nopacking instruction is found

the system couyld not fount the packing istruction for the materila spoiler_s

the dignosis

in this process

various causes such as

there is no packing instruction record for this

the wrong dtermination process used to start packing istruction determination

Message was edited by:

subrat panda

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Subrat,

<b>Packing Process:</b>

Before creating the <b>packaging material</b> you have to go to:

IMG-Logistics Execution-Shipping -Packing.

1. <b>Define packaging material types</b>- it can be anything like boxes crates, etc. in this you have to maintain the output determination procedure, output type, plant determination, packaging material category, generate delivery items, number assignment. you can copy from standard also.

2. Then go to define <b>material group for packaging materials</b> - Here you maintain the four digit code and the description. Actually, this group is nothing but similar products which require similar packing products. For Ex. Nokia Phones all types they are basically packed first into a polythene bag. <b>So here nokia phones can become a material group for packaging materials and polythene bag can become the packaging material type which can include different sizes and types of polythene bags</b>.

3. Define <b>Allowed Packaging Materials</b> - Here you assign the shipping group for packaging materials to the packaging material type. This is related to your mterial master data of the packaging material which you create.

4. Now go to <b>MM01</b> to create a packaging material. use material type as <b>Packaging material</b> then inside the system will take the item category group as <b>VERP</b>. Then in the <b>Basic Data1</b> screen you have the material group for packaging material <b>(MGPM)</b>. Select the proper one. Now in the <b>Sales:General/ Plant</b> screen you have to maintain data regarding the packaging. The MGPM will be same as in the basic data 1 screen, then select the <b>packaging material type</b>, the <b>allowed pkg weight</b>, <b>allowed pkg volume</b>. This is important because if the <b>weight</b> of your finished item is 2 KG and in the allowed pkg weight you enter only 1.5 KG, then while you carry out the packing process in delivery, the system will give you error, <b>"packaging weight exceeded."</b> The assignment in the IMG creen for Define allowed packaging materials should be same as u mention in the material master. Then save your material master for packaging material.

5. <b>VA01</b> create the order, save it.

6. <b>VL01N</b> enter shipping point, go to edit - <b>pack</b>- you will face a screen with 2 parts. In the top part you select your <b>packaging material</b> in which you want to pack your finished item, enter the system will assign a number to that material. Now select the Material in the top part and the finished one in the lower part and click on the <b>Icon Pack</b>. Here one thing has to be taken care of. Suppose if you want to pack only one finished item in one packaging material, then in the lower part of the screen you have a field for partial quantity here you chnge it to 1. system will prompt quantity changed. now you select the material in the top part and the one in the lower part and click on the <b>PER PART. QTY ICON</b>. In this way the system will pack only one finished item in a single packaging material. Packing is done go back, select the picking and do the PGI. save the delivery and create the invoice.

This is basically the packing process. Hope this clarifies your doubts to some extent.

<b>Regarding your problem:</b>

Packing proposal comes into picture <b>only in case of automatic packing</b>.

IMG - logistics general - handling unit management - automatic packing.

<b>Check the following:</b>

1. Maintain parameters for packing instructions - T.code is OVHU2

2. Maintain number ranges for packing instructions - T.code is OPIN

3. IMG - logistics general - handling unit management - automatic packing - packing instructions master data - define check profile for packing status.

4. IMG - logistics general - handling unit management - automatic packing - packing instructions master data - define key for packing instructions determination.

Create characteristic combination for search key - OFP5

Change characteristic combination for search key - OFP6

Display characteristic combination for search key - OFP7

Permitted characteristics - OFP8

5. Define Access Sequence for Packing Instruction Determination - OFP2

6. Define Determination Type for Packing Instructions - OFP3

7. Define Procedure for Packing Instructions Determination - OFP4

8. Define Number Ranges for Packing Instruction Determination Records - OVHU3

9. Create packing instructions - POP1

10. Create determination records for packing instructions - POF1

Reward points if solution helps.

Regards,

Allabaqsh G. Patil

Message was edited by:

allabaqsh patil

Answers (1)

Answers (1)

rmazzali
Active Contributor
0 Kudos

you have to create the packing master data in tcodes POF1 and POP1.

In POP1 you create the packing rule, eg. how many pieces of the material to be packed can be stored in the packaging material (box, cans,...)

in POF1 you create the determination rule, eg. the link between the material and the rule.

for more details have a look to:

http://sap-img.com/sap-sd/process-in-packing.htm

http://sap-img.com/sap-sd/the-packing-process-with-an-example.htm

Roberto

Former Member
0 Kudos

but in POP1 no values are there

and POF1also wat is the rules to detrmine