cancel
Showing results for 
Search instead for 
Did you mean: 

Heterogeneous System Copy

Former Member
0 Kudos

Hello All! We want BW 3.5 based on NW 2004 release 640 system copy for

WIN 32bit ---> HP-UX 11.0. Exists 2 method copy :

1) R3Load procedures

2) R3load Procedures using the Migration Monitor.

Please advise what better choose?

Thanks All !!

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hello Sergo,

I would recommend the use of the migration monitor as this allows you to track down any potential errors in the tabbarts \ tsk files a lot faster than if you do not have it.

Regards,

David

Answers (1)

Answers (1)

vincentlim826
Employee
Employee
0 Kudos

With migration monitor, you can perform and control and unload/load process during the sys copy process. From NW 2004 SR1 onwards, migration monitor is integrated into SAPinst tool. See also SAP Note 784118.

But of course there are other optimization methods, i.e Package Splitting/Table Spliting/Loadprocedure -fast option and so on.

See also SAP Note

547314 FAQ: System Copy procedure

771209 NW04: System copy (supplementary note)

cheers,

Vincent