cancel
Showing results for 
Search instead for 
Did you mean: 

Route has no Valid Legs

Former Member
0 Kudos

Hi Guys,

When I am creating shippment in ( VT01N) & after completion the planning & execution , then " when i click the cost simulation icon" the system is issuing POP message stayting that " SHIPMENT COST NOT YET CALCULATED".

and in the message bar <b>"Route has no Valid Legs"</b>.

Kindly give the inputs to check the configuration .

Thanks in advance

Satya

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi Satya

Shipment Costs can be either at:

Header (Eg: Insurance)

Item (Loading and Unloading Costs)

Configuration involves

Defining Shipment Cost Type [Header – Status requirement fo Cost Calculation]

Define Item Category (Parameters for Shipment Costing and Settlement) [Item]

Sub-Item (Calculation Base Eg: Shipment Cost Item / Handling Units / Delivery / Delivery Items)

Calculation Base:

Shipment Cost Item: Leg and Total Weight are relevant

Handling Unit

Delivery : Ship-to-party basis

Delivery Item: Freight Classes

Configuration involves

Defining Shipment Cost Type [Header – Status requirement fo Cost Calculation]

Define Item Category (Parameters for Shipment Costing and Settlement) [Item]

Sub-Item (Calculation Base Eg: Shipment Cost Item / Handling Units / Delivery / Delivery Items

Logistics Execution &#61664; Transportation &#61664; Shipment Costs &#61664; Basic Functions &#61664; Define Date Rules

Assignment of Item ProcedureGroup, Service Agent Procedure Group, Shipping

Type Procedure Group to Pricing Procedure for a Transportation Planning Point

Assignment of Transportation Planning Point and Shipment Cost Type to Purchasing Organization, Purchase Group and Plant

Automatic Settlement of Planned Delivery Costs for a

Vendor.Activate Automatic Settlement for a Combination of

Company Code. Purchasing Organization and Forwarding

Agent (Vendor)

T_code: TK11

Define the shipment cost.

Legs can be of single chain are Multi leg. U have to define the Legs.

Define Modes of Transport

Path: Spro—Logistics Execution—Transportation—Basic Transportation Function---Routes—Define Routes—Define Modes of Transport.

Define Shipping Types

Path: Under the Same Menu path---Define Shipping Types

Define Transportation Connection Point

Path: Under the Same Menu path--- Define Transportation Connection Point.

Define Routes and Stages.

Path: Under the Same Menu path--- Define Routes and Stages.

Maintain Stages for all Routes.

Path: Under the Same Menu path---Maintain Stages for all Routes.

U have to setup all the above process to get a Valid legs.

Reward if it is useful to u

Former Member
0 Kudos

Hi narendra,

Thanks for ur reply,

I am trying to calculate the cost for Direct Leg. can u give the input for where we can maintain LEG indicator in the route .

regards,

Satya

Former Member
0 Kudos

Hi

Can u give ur mail id. i will send u the entire configuration document of shipment cost.

Regards

Former Member
0 Kudos

hi narender,

Thanks for ur support and my mail id is <u>msnreddy.sap@gmail.com</u>

pls send it for directleg.

Thanks

SSatya

Former Member
0 Kudos

Hi

I have send the document to ur id. refer it.

Reward if its is useful to u.

Former Member
0 Kudos

Hi narenda,

Thanks a lot.

Regards,

Satya

Former Member
0 Kudos

hi reddy

check this link for route determination

Former Member
0 Kudos

Hi Satya,

Check the Transportation Connection point/Legs you have created in route determination. check all assignment in route determination.

Reward if it helps.

Rgds.

Bidhu.

Former Member
0 Kudos

Hi BiDU,

I am try to calculate the cost for the direct LEG . i checked the configuration.can u give the detail configuration step by step

thaks

Satya